Project Name
SHOP SWAP
Proposer
Jarrod Hicks hicksu@gmail.com
Summary
I propose to switch the location of the Church classroom and the Dirty Shop.
What Will Be Done
See Drawings. Enclose (E) Church classroom, move sliding door from (E) shop to (N) enclosing wall. Remove rear door in turing and fill in wall. Move Shop equipment and case work to shop. Install electrical and ventilation equipment (TBD). Fill in slider opening to (N) Church. Install door from Turing in (N) Church. Finish and Paint walls in (N) Church. Move classroom equipment to (N) Church.
What Areas in the Space Will This Affect
Dirty Shop, Church Classroom
Who Will Be Doing It
Jarrod Hicks, so far.
Why This Will Be Good
We will move the noise of the shop to the perphery of NoiseBridge. The shop will be easier to ventilate using the skylight and east windows. It will be closer to the kitchen for cleanup. Church classroom will be near the entrance making classes in church more visible to attendees and other visitors of the space. We will have more control of lighting and noise levels in the classroom.
Why This Will Be Bad
It will be alot of work. Both rooms will be unuseable during some of the transistion.
How Long Will It Take
Most of the work can be done while Noisebridge is open. Timeline TBD.
In A Fantastic World, What Extra Budget Would You Like
Funds to pay for lumber, sheetrock, paint, electrical equipment, and ventilation fan(s) will be needed. Estimate TBD.
Are There Any Other PFAs This Would Work Well With
Most Likely, specifics to be added.
Are There Any Other PFAs This Would Contradict
Currently Unknown, I will provided updates as needed.