Editing Shop Swap
Jump to navigation
Jump to search
The edit can be undone. Please check the comparison below to verify that this is what you want to do, and then publish the changes below to finish undoing the edit.
Latest revision | Your text | ||
Line 11: | Line 11: | ||
Enclose (E) Church classroom, move sliding door from (E) shop to (N) enclosing wall. Remove rear door in turing and fill in wall. Move Shop equipment and case work to shop. Install electrical and ventilation equipment (TBD). Fill in slider opening to (N) Church. Install door from Turing in (N) Church. Finish and Paint walls in (N) Church. Move classroom equipment to (N) Church. | Enclose (E) Church classroom, move sliding door from (E) shop to (N) enclosing wall. Remove rear door in turing and fill in wall. Move Shop equipment and case work to shop. Install electrical and ventilation equipment (TBD). Fill in slider opening to (N) Church. Install door from Turing in (N) Church. Finish and Paint walls in (N) Church. Move classroom equipment to (N) Church. | ||
=== What Areas in the Space Will This Affect === | === What Areas in the Space Will This Affect === | ||
Line 70: | Line 21: | ||
=== Why This Will Be Bad === | === Why This Will Be Bad === | ||
It will be alot of work. Both rooms will be unuseable during some of the transistion. | It will be alot of work. Both rooms will be unuseable during some of the transistion. | ||
=== How Long Will It Take === | === How Long Will It Take === | ||
Most of the work can be done while Noisebridge is open. Timeline TBD. | Most of the work can be done while Noisebridge is open. Timeline TBD. |