| go through the piles of to-hack stuff and move some of it to a staging place to go out || so we can tighten up || what it says || jim and others || fourth week in november  
| go through the piles of to-hack stuff and move some of it to a staging place to go out || so we can tighten up || what it says || jim and others || fourth week in november  
|-  
|-  
|-
| Get one of Cernio's cabinets and move the servers and the new UPSes into it || Because the current UPS doesn't work right || Get a truck and 2-3 people || jim, Jesus, and others || before the UPS blows up
|-  
|-  
| link this page to the touch screens and reverse engineering bar screen along with maintenance tasks such as sweeping and washing dishes || so people who come into the space and don't necessarily read the wiki can get ideas on how to contribute || duct tape || ??? || ???
| link this page to the touch screens and reverse engineering bar screen along with maintenance tasks such as sweeping and washing dishes || so people who come into the space and don't necessarily read the wiki can get ideas on how to contribute || duct tape || ??? || ???
|-
|-
|}
|}

Revision as of 23:03, 21 October 2010

Shit What Needs Done

What Why How Who When
exit signs So we don't all die in a fire Buy signs, put them up? John Waters ???
flammables storage cabinet So we don't all die in a fire Buy one, put it in ??? ???
massive cleanup of piles Fewer places for vermin (rats, hippies, door to door salesmen) to take up residence e-waste pickup John Waters ???
entrance lights/switches so we can see when we come in finish the pipe runs, pull wires, hang and connect light fixtures jim and others second week in november
finish shelves in storage/rack room so we can put stuff away better move stuff off the top shelves, install new top shelves jim and others third week in november
go through the piles of to-hack stuff and move some of it to a staging place to go out so we can tighten up what it says jim and others fourth week in november
Get one of Cernio's cabinets and move the servers and the new UPSes into it Because the current UPS doesn't work right Get a truck and 2-3 people jim, Jesus, and others before the UPS blows up
link this page to the touch screens and reverse engineering bar screen along with maintenance tasks such as sweeping and washing dishes so people who come into the space and don't necessarily read the wiki can get ideas on how to contribute duct tape ??? ???