Moving/Tasks: Difference between revisions

From Noisebridge
Jump to navigation Jump to search
(New page: = The list of things that need to be done before, during and after our move. = Should be in actual order that they need to be done. # get consensus that we're moving # find somewhere to ...)
 
No edit summary
(3 intermediate revisions by 2 users not shown)
Line 1: Line 1:
= The list of things that need to be done before, during and after our move. =
== The list of things that need to be done before, during and after our move. ==


Should be in actual order that they need to be done.
Should be in actual order that they need to be done; of course, many will overlap.


# get consensus that we're moving
# get consensus that we're moving
# find somewhere to move to
# find somewhere to move to
# resolve existing lease exit with landlord
# get consensus on layout for new location
# apply for new location/sign contract
# get keys
#<del> copy new keys and distribute to members</del> get locks keyed to 83c keys
# activate all utilities
# install any needed fixtures
# move furniture and equipment
# set up furniture and equipment in new location
# decorate
# sleep
# PARTY

Revision as of 17:02, 12 June 2009

The list of things that need to be done before, during and after our move.

Should be in actual order that they need to be done; of course, many will overlap.

  1. get consensus that we're moving
  2. find somewhere to move to
  3. resolve existing lease exit with landlord
  4. get consensus on layout for new location
  5. apply for new location/sign contract
  6. get keys
  7. copy new keys and distribute to members get locks keyed to 83c keys
  8. activate all utilities
  9. install any needed fixtures
  10. move furniture and equipment
  11. set up furniture and equipment in new location
  12. decorate
  13. sleep
  14. PARTY