Moving/2169 Mission/challenges
Jump to navigation
Jump to search
Overview
There has been much discussion on the mailing list about various issues faced with moving to 2169 Mission. Please list the various issues you think that Noisebridge should address.
- Lack of published budget showing we can afford this space with our existing run rate AND afford the required/desired upgrades?
- is 2169 accessible to wheelchair users?
- is the vermin problem (due to the greengrocery downstairs) large or small?