Moving/2169 Mission/challenges: Difference between revisions

From Noisebridge
Jump to navigation Jump to search
No edit summary
Line 3: Line 3:


* Lack of published budget showing we can afford this space with our existing run rate AND afford the required/desired upgrades?
* Lack of published budget showing we can afford this space with our existing run rate AND afford the required/desired upgrades?
* is 2169 accessible to wheelchair users?
* is the vermin problem (due to the greengrocery downstairs) large or small?


=Move in cost=
=Move in cost=


=Build-out cost=
=Build-out cost=

Revision as of 19:11, 20 July 2009

Overview

There has been much discussion on the mailing list about various issues faced with moving to 2169 Mission. Please list the various issues you think that Noisebridge should address.

  • Lack of published budget showing we can afford this space with our existing run rate AND afford the required/desired upgrades?
  • is 2169 accessible to wheelchair users?
  • is the vermin problem (due to the greengrocery downstairs) large or small?

Move in cost

Build-out cost