This is a page for capturing ideas associated with the buildout of [[Moving/2169_Mission|2169 Mission #300]] (aka The Sweatshop). [http://spreadsheets.google.com/ccc?key=tzXKH4yAAd_dYWgQ3r5fgDA&inv=noisebridge-discuss@lists.noisebridge.net&t=7232956306826644388&guest Google doc budget spreadsheet here] | |||
= Service Requirements = | |||
* City waste dumpster and permits | |||
* Sales tax free account at local big box hardware/contractor store (yay 501(c)(3)) | |||
= Pre Move Stuff from 2009-08-07 = | |||
*landlord point of contact - andy | |||
**remove drying racks or junk? | |||
**industrial sewing machines | |||
***$200 a piece to us | |||
**landlord dealing w/ sliding doors to fire escape | |||
***no idea what this is but it kept getting mentioned | |||
*moving day - reuben | |||
*walls - shannon | |||
**wall plan | |||
***recycle as much material as possible for bath/walls/etc | |||
***new floor plan | |||
**area of rescue assitance | |||
***in shop? | |||
***near side exit ok? | |||
**lighting | |||
***rear area should be raised at leats 2' | |||
***projectionable spaces | |||
*interwebs - matt petersen | |||
*kitchen/bath - miloh/christie | |||
**kitchen | |||
***standalone counter/sink | |||
***electric stove (no gas hookup) | |||
***test existing fridge? | |||
***placement? | |||
****rearward but along which axis? | |||
***drain stub work contemporary w/ bathroom work | |||
***dishwasher? disposal? | |||
***kitchen wants/needs - stove + 2 circuits | |||
**bathrooms | |||
***scott - 510-904-7448 | |||
***expand front into ada | |||
****bigger (5' turning radius minimum) | |||
****rotate existing toilet | |||
****wall mount sink (maybe not longer one) | |||
****walls to ceiling | |||
****door placement? | |||
***tie into existing drain venting | |||
**existing hot water downstairs | |||
*hvac - ben | |||
**central line? (back/front orientation) | |||
**active venting/cooling/heating? | |||
*access/interior control - dr jesus | |||
**currently, lots of keys | |||
**inner glass door | |||
***locks from inside/outside | |||
**upstairs 'entrance' | |||
***elevator/stairwell separable? | |||
***full wall? | |||
***remove current gates for now (one less key) | |||
*elec - rachel/jim | |||
**front electrical enable/joint account | |||
**one electrical panel poorly wired | |||
***eg, 50A breaker to 8 rated wires | |||
***'self' upgrade to code-ish is easy/cheap | |||
**ceiling rails | |||
***has ground lines but wired well? | |||
***boxes are 'custom' so need to be checked as well | |||
*floors - ? | |||
**rear patching | |||
**refinish | |||
*add utilities to nb titled accounts | |||
**water | |||
**sewage | |||
**garbage service | |||
**interwebs | |||
**mail box? | |||
***weirdly shared downstairs | |||
***po box? | |||
**insurance | |||
***no water damage coverage? | |||
**dumpster rental for demo? | |||
***need 'permit' or something to park out front | |||
= Build Meeting 2009-08-14 = | |||
Lights - Shannon | |||
* Bringing lights in rear up to level of lights in front, or somewhat higher to put in walls | |||
* Could possible raise them higher, working with Neil Sunday | |||
Painting | Painting | ||
* Budget: TBD | |||
* Going to do with volunteer muralists | |||
* We will not hold off on moving | |||
* Basecoat Only, Something Close to White | |||
* Needs a person to handle paint - co-headed by Steve C and Rachel McC | |||
= Sub-Spaces = | |||
== Spaces at 83c == | |||
83c has subspaces consisting of: | |||
* The Main / Meeting Room | |||
== Spaces Planned for the Sweatshop == | |||
=== Concept: Usage Zones === | |||
==== Academic / Classroom ==== | |||
consisting of conference / classrooms, areas suitable for learning, planning, and colaboration. Room ideas are: | |||
* Dungeons and Dragons room: a rectangular room with a board-room style table in it, walls covered in bookshelves and whiteboards. | |||
* Math Room: Krutcher suggests that rather than a "conference room" style classroom, maybe we want a "math room" -- essentially a room with a couple of small tables, some chairs or couches, lots of pacing space, and a bunch of whiteboards; the idea is to facilitate active, creative discussion. | |||
* Study Rooms: Small rooms just big enough for four people to crowd into or one person to spread out in. | |||
* The chill space / lounge conceptually could belong to this Zone. | |||
* Library -- bookshelves, chairs/cushions/lighting for individual reading, some tables for quiet study | |||
* Possible to have a graphics/drafting area? Light table and drafting tables w/maylines, ETC. | |||
==== Make / Build==== | |||
Consisting of shop and lab space. Ideas include: | |||
* Dirty Shop -- the machine room / fab space for actually sawing, hammering, lathing and milling. | |||
* Clean Shop -- electronics lab filled with benches for soldering &c. | |||
* Craft Space -- suitable for textile work &c | |||
* Darkroom -- For developing pictures; double doors to allow entry when dark; red lighting | |||
* Chem lab -- space suitable for chemistry / bio work | |||
* A/V studio -- soundproof room. | |||
** big enough for a small band and mics | |||
** greenscreen & camera recording | |||
** Ham shack -- Amaetur radio operating room. Needs good way to get feed lines to the roof. | |||
Common needs: | |||
* positive airflow ventilation to outside | |||
* pressurized hoses to operate tools, blow / suck debris | |||
* possible water & drainage hookup | |||
* strong power lines | |||
* security / fencing-off for party times | |||
* sound barrier to other zones | |||
==== Teams ==== | |||
* Painting -- Responsible for prepping and painting the vertical surfaces of the space beneath the ceiling and over the floor. Contact [[User:mrcamuti|Steve AKA Mooch]] , [[User:rachel|Rachel]] |
Revision as of 19:13, 26 August 2009
This is a page for capturing ideas associated with the buildout of 2169 Mission #300 (aka The Sweatshop). Google doc budget spreadsheet here
Service Requirements
- City waste dumpster and permits
- Sales tax free account at local big box hardware/contractor store (yay 501(c)(3))
Pre Move Stuff from 2009-08-07
- landlord point of contact - andy
- remove drying racks or junk?
- industrial sewing machines
- $200 a piece to us
- landlord dealing w/ sliding doors to fire escape
- no idea what this is but it kept getting mentioned
- moving day - reuben
- walls - shannon
- wall plan
- recycle as much material as possible for bath/walls/etc
- new floor plan
- area of rescue assitance
- in shop?
- near side exit ok?
- lighting
- rear area should be raised at leats 2'
- projectionable spaces
- wall plan
- interwebs - matt petersen
- kitchen/bath - miloh/christie
- kitchen
- standalone counter/sink
- electric stove (no gas hookup)
- test existing fridge?
- placement?
- rearward but along which axis?
- drain stub work contemporary w/ bathroom work
- dishwasher? disposal?
- kitchen wants/needs - stove + 2 circuits
- bathrooms
- scott - 510-904-7448
- expand front into ada
- bigger (5' turning radius minimum)
- rotate existing toilet
- wall mount sink (maybe not longer one)
- walls to ceiling
- door placement?
- tie into existing drain venting
- existing hot water downstairs
- kitchen
- hvac - ben
- central line? (back/front orientation)
- active venting/cooling/heating?
- access/interior control - dr jesus
- currently, lots of keys
- inner glass door
- locks from inside/outside
- upstairs 'entrance'
- elevator/stairwell separable?
- full wall?
- remove current gates for now (one less key)
- elec - rachel/jim
- front electrical enable/joint account
- one electrical panel poorly wired
- eg, 50A breaker to 8 rated wires
- 'self' upgrade to code-ish is easy/cheap
- ceiling rails
- has ground lines but wired well?
- boxes are 'custom' so need to be checked as well
- floors - ?
- rear patching
- refinish
- add utilities to nb titled accounts
- water
- sewage
- garbage service
- interwebs
- mail box?
- weirdly shared downstairs
- po box?
- insurance
- no water damage coverage?
- dumpster rental for demo?
- need 'permit' or something to park out front
Build Meeting 2009-08-14
Lights - Shannon
- Bringing lights in rear up to level of lights in front, or somewhat higher to put in walls
- Could possible raise them higher, working with Neil Sunday
Painting
- Budget: TBD
- Going to do with volunteer muralists
- We will not hold off on moving
- Basecoat Only, Something Close to White
- Needs a person to handle paint - co-headed by Steve C and Rachel McC
Sub-Spaces
Spaces at 83c
83c has subspaces consisting of:
- The Main / Meeting Room
Spaces Planned for the Sweatshop
Concept: Usage Zones
Academic / Classroom
consisting of conference / classrooms, areas suitable for learning, planning, and colaboration. Room ideas are:
- Dungeons and Dragons room: a rectangular room with a board-room style table in it, walls covered in bookshelves and whiteboards.
- Math Room: Krutcher suggests that rather than a "conference room" style classroom, maybe we want a "math room" -- essentially a room with a couple of small tables, some chairs or couches, lots of pacing space, and a bunch of whiteboards; the idea is to facilitate active, creative discussion.
- Study Rooms: Small rooms just big enough for four people to crowd into or one person to spread out in.
- The chill space / lounge conceptually could belong to this Zone.
- Library -- bookshelves, chairs/cushions/lighting for individual reading, some tables for quiet study
- Possible to have a graphics/drafting area? Light table and drafting tables w/maylines, ETC.
Make / Build
Consisting of shop and lab space. Ideas include:
- Dirty Shop -- the machine room / fab space for actually sawing, hammering, lathing and milling.
- Clean Shop -- electronics lab filled with benches for soldering &c.
- Craft Space -- suitable for textile work &c
- Darkroom -- For developing pictures; double doors to allow entry when dark; red lighting
- Chem lab -- space suitable for chemistry / bio work
- A/V studio -- soundproof room.
- big enough for a small band and mics
- greenscreen & camera recording
- Ham shack -- Amaetur radio operating room. Needs good way to get feed lines to the roof.
Common needs:
- positive airflow ventilation to outside
- pressurized hoses to operate tools, blow / suck debris
- possible water & drainage hookup
- strong power lines
- security / fencing-off for party times
- sound barrier to other zones
Teams
- Painting -- Responsible for prepping and painting the vertical surfaces of the space beneath the ceiling and over the floor. Contact Steve AKA Mooch , Rachel