Editing Moving/2169 Mission/Buildout
Jump to navigation
Jump to search
The edit can be undone. Please check the comparison below to verify that this is what you want to do, and then publish the changes below to finish undoing the edit.
Latest revision | Your text | ||
Line 225: | Line 225: | ||
* Walls -- Responsible for building partitions to enclose individual rooms and spaces. Contact Shannon. | * Walls -- Responsible for building partitions to enclose individual rooms and spaces. Contact Shannon. | ||
* [[SCADA]] -- Responsible for controls for HVAC and electrical, and HMI deployment. Contact [[User:dr_jesus|Dr. Jesus]]. | * [[SCADA]] -- Responsible for controls for HVAC and electrical, and HMI deployment. Contact [[User:dr_jesus|Dr. Jesus]]. | ||
* Painting -- Responsible for prepping and painting the vertical surfaces of the space beneath the ceiling and over the floor. Contact [[User:mrcamuti|Steve AKA Mooch]] | * Painting -- Responsible for prepping and painting the vertical surfaces of the space beneath the ceiling and over the floor. Contact [[User:mrcamuti|Steve AKA Mooch]] [[User:rachel|Rachel]] | ||
==== DXF and SKP Cad Files ==== | ==== DXF and SKP Cad Files ==== |