Editing
Moving/2169 Mission/Buildout
(section)
Jump to navigation
Jump to search
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
= Build Meeting 2009-08-14 = Notes: Mike Wright Walls Team - Shannon * Budget: TBD, should be less than $400 * Peter and others removing existing walls * Leaving Disco-Booth, Small Office, and Wall near Bathrrom * Removing all other dividing walls * Mike W making Sketchup components of immovable objects * Shannon Making Sketchup of new walls * Theoretical idea (blue tape marked on floor): * Disco Space near kitchen and bathrooms * Classroom Space near Mission End of building Lights - Shannon * Bringing lights in rear up to level of lights in front, or somewhat higher to put in walls * Could possible raise them higher, working with Neil Sunday Painting * Budget: TBD * Going to do with volunteer muralists * We will not hold off on moving * Basecoat Only, Something Close to White * Needs a person to handle paint - co-headed by Steve C and Rachel McC Floors - Separate from Build Team * Budget $6000 Electrical - Jim,Rachel * Neil Interested in helping * Budget: unknown until spaces and needs determined * People building spaces should let Rachel and Jim know what they want to power Networking * Budget: $250 Access Control - Dr. Jesus * Locks, Etc * Budget $1000 Kitchen - Milo and Christie * Will share wall with bathrooms * Budget: $2000 Moving - Rubin * Budget: none needed * Scheduled to start on Initial Move-In Space * Build out a Space to use while finishing rest of space * Kitchen and social space on east side of Building * Starting Line for Shop Spae is 3rd colum counting from back wall * Initlal Move-In to social space which will be done by move in date Bathroom - Contractor * Some discussion around pricing * general thought is we're too far along to change * Budget: $6000 Covered by Landlord Ventilation - Ben, not present * Budget: Unknown * Not waiting for ventilation for Move-In * We can put big fans at one end to ventilate over the top of 8' divider walls
Summary:
Please note that all contributions to Noisebridge are considered to be released under the Creative Commons Attribution-NonCommercial-ShareAlike (see
Noisebridge:Copyrights
for details). If you do not want your writing to be edited mercilessly and redistributed at will, then do not submit it here.
You are also promising us that you wrote this yourself, or copied it from a public domain or similar free resource.
Do not submit copyrighted work without permission!
To protect the wiki against automated edit spam, we kindly ask you to solve the following CAPTCHA:
Cancel
Editing help
(opens in new window)
Navigation menu
Personal tools
Not logged in
Talk
Contributions
Log in
Request account
Namespaces
Page
Discussion
English
Views
Read
Edit
View history
More
Search
Dig in!
Noisebridge
- Status: MOVED
- Donate
- ABOUT
- Accessibility
- Vision
- Blog
Manual
MANUAL
Visitors
Participation
Community Standards
Channels
Operations
Events
EVENTS
Guilds
GUILDS
- Meta
- Electronics
- Fabrication
- Games
- Music
- Library
- Neuro
- Philosophy
- Funding
- Art
- Crypto
- Documentation/Wiki
Wiki
Recent Changes
Random Page
Help
Categories
(Edit)
Tools
What links here
Related changes
Special pages
Page information