Editing Meeting Notes 2009 09 22
Jump to navigation
Jump to search
The edit can be undone. Please check the comparison below to verify that this is what you want to do, and then publish the changes below to finish undoing the edit.
Latest revision | Your text | ||
Line 26: | Line 26: | ||
* Electrical at 2169 | * Electrical at 2169 | ||
* Internets at 2169 | * Internets at 2169 | ||
* The mountain of 83c at 2169 | |||
Scattered reports of intermittent problems with wireless access, mostly due to users tunneling traffic out for privacy reasons and not the APs. status.noisebridge.net thinks that the DSL circuit is stable now, and what should be the last of the AP problems should be ironed out now. | Scattered reports of intermittent problems with wireless access, mostly due to users tunneling traffic out for privacy reasons and not the APs. status.noisebridge.net thinks that the DSL circuit is stable now, and what should be the last of the AP problems should be ironed out now. | ||
Line 40: | Line 41: | ||
The crackhead tester machine is over on the shelf and can be installed downstairs as soon as the maglock controller is installed. | The crackhead tester machine is over on the shelf and can be installed downstairs as soon as the maglock controller is installed. | ||
== Consensus items == | == Consensus items == |