Editing Meeting Notes 2008 10 21
Jump to navigation
Jump to search
The edit can be undone. Please check the comparison below to verify that this is what you want to do, and then publish the changes below to finish undoing the edit.
Latest revision | Your text | ||
Line 29: | Line 29: | ||
* Ordering things as "Noisebridge" | * Ordering things as "Noisebridge" | ||
** meredith wants to order things that can only be ordered by corps, wants to do this as Noisebridge, wants to know if we can do it. | ** meredith wants to order things that can only be ordered by corps, wants | ||
to do this as Noisebridge, wants to know if we can do it. | |||
** jake suggests that meredith is offering to be in charge of ordering chemicals/bios for the group and will keep the list appraised. | * mik mentions the previous discussion, liability issues (zipcar). | ||
** Rigel suggests issue of naming, "Noisebridge Research"; we note that we're incorporated as "Noisebridge". Merideth says "Noisebridge, Synthetic Chemistry Division". | "orders pathogenic bacteria as noisebridge and spreads them in the water | ||
** Soil chemistry issues, pathogens, == peanut allergy. Issues of getting raided by $TLA. What ingredients to worry about, etc. "Bombmaking materials" list, but it includes things like "pipes" and "wires". | supply". | ||
** Meredith points out not ordering reagents, etc until we have cabinets to store it safely. | ** jake suggests that meredith is offering to be in charge of ordering | ||
chemicals/bios for the group and will keep the list appraised. | |||
** Rigel suggests issue of naming, "Noisebridge Research"; we note that | |||
we're incorporated as "Noisebridge". Merideth says "Noisebridge, | |||
Synthetic Chemistry Division". | |||
** Soil chemistry issues, pathogens, == peanut allergy. Issues of getting | |||
raided by $TLA. What ingredients to worry about, etc. "Bombmaking | |||
materials" list, but it includes things like "pipes" and "wires". | |||
** Meredith points out not ordering reagents, etc until we have cabinets to | |||
store it safely. | |||
Jake points out the costs shouldn't accrue to Noisebridge, no service | |||
contracts. | |||
Consensus is deferred to next meeting. | |||
multiple people identified rigel's ringtone as being a 9600baud | |||
negotiation rather than 2400baud. | |||
* Agenda Item: napping pods. | * Agenda Item: napping pods. | ||
**proposal is to build a set of napping pods in the front of the upstairs closets. three levels (two shelves), with padding. | **proposal is to build a set of napping pods in the front of the upstairs closets. three levels (two shelves), with padding. |