Editing
Kitchen Mission
(section)
Jump to navigation
Jump to search
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
=== What Will Be Done === (Based on the 07/09/2013 Rebase meeting, this proposal is being modified to include a refrigerator and no longer change the 3 compartment sink.) I am proposing a quick initial demo phase and then a longer rebuilding phase. Phase 01: The first phase is a demo cleaning phase. While it may sound drastic, it will not leave the kitchen with any less functionality then is intended in the final phase. Phase 01 includes removal of the food storage and a severe reduction of the cabinet space. All food will be removed from the kitchen. Items in the cabinets will be reorganized, donated, or discarded. Temporary open wire shelves will be used to hold the remainder of the existing stuff. The kitchen island will be demolished except for the stove (The Noisebridge mosaic will be preserved). and the area of the island under the stove will be opened up. The cabinets will be removed from the kitchen, broken down, and placed in the dump pile for removal. A bracket will be installed to support the existing shelf over the sink. The remaining equipment, floor, and the area of the kitchen will be deep cleaned. Safe pest control stuff may also be used. Phase 02 is a longer cleaning, improving, and rebuilding phase. A period of cleaning and ongoing pest control will occur while the new kitchen equipment is being sourced, built and installed. The goal of phase two is to create a more useful and more accessible kitchen. All major equipment and counters conform, at least, to ADA guidelines whenever possible. OVEN and MICROWAVE: The double oven should be replaced with a more reliable single oven and lower to the ground. This will go where the refrigerator is currently. This will be installed in a full height cabinet which will also contain the microwave. Above this will be shelves to hold the hacking/event equipment: chafing dishes, burners, fermentation tools and so on. SINK: The existing 3 compartment sink will be moved and lowered for greater accessibility. (In Progress 08/21/2013) STOVE: The existing stove top will be mobilized; built into a new counter top with wheels attached. The stove will be outfitted with an electrical plug connector and outlets will be installed in areas likely for the stove to be used. An extension cable may also be appropriate. STORAGE: Above the sink, sturdy functional drying racks will be installed for dish drying and storage. Storage for knives and utensils will be attached the walls near the sink.
Summary:
Please note that all contributions to Noisebridge are considered to be released under the Creative Commons Attribution-NonCommercial-ShareAlike (see
Noisebridge:Copyrights
for details). If you do not want your writing to be edited mercilessly and redistributed at will, then do not submit it here.
You are also promising us that you wrote this yourself, or copied it from a public domain or similar free resource.
Do not submit copyrighted work without permission!
To protect the wiki against automated edit spam, we kindly ask you to solve the following CAPTCHA:
Cancel
Editing help
(opens in new window)
Navigation menu
Personal tools
Not logged in
Talk
Contributions
Log in
Request account
Namespaces
Page
Discussion
English
Views
Read
Edit
View history
More
Search
Dig in!
Noisebridge
- Status: MOVED
- Donate
- ABOUT
- Accessibility
- Vision
- Blog
Manual
MANUAL
Visitors
Participation
Community Standards
Channels
Operations
Events
EVENTS
Guilds
GUILDS
- Meta
- Electronics
- Fabrication
- Games
- Music
- Library
- Neuro
- Philosophy
- Funding
- Art
- Crypto
- Documentation/Wiki
Wiki
Recent Changes
Random Page
Help
Categories
(Edit)
Tools
What links here
Related changes
Special pages
Page information