Current Consensus Items: Difference between revisions
No edit summary |
(Remove skyline cleaning from consensus items) |
||
Line 8: | Line 8: | ||
! Wording | ! Wording | ||
! Author of this Record | ! Author of this Record | ||
|- | |- | ||
|3/12/2012 | |3/12/2012 |
Revision as of 21:32, 22 May 2012
This is a page for hosting consensus items currently under debate, with their formal wording.
The Consensus Items History is the public record of consensus items that have been decided on in the past. Please move the records from the "Current" page to the "History" page once they've been approved/blocked.
Date First Discussed | Proposed By | Wording | Author of this Record |
---|---|---|---|
3/12/2012 | Miloh | Request for up to $300.00 of Noisebridge funds to improve the electronics area infrastructure. Up to $300.00 would be allocated for the cost of material needed to build a 4th electronics bench, an equipment hutch for the bench, and a storage cabinet for the electronics tools at Noisebridge. Any direct donations to support this project would reduce the amount used from Noisebridge funds by an equal amount.
$120 qty3 plywood sheets $30 qty10 8' 2x4's $30 qty3 8' 1x1 moulding wood $80 5 sets of linear drawer slides $40 dowels, pins, isc. fasteners TOTAL $300.00
|
Miloh |