Current Consensus Items: Difference between revisions

From Noisebridge
Jump to navigation Jump to search
No edit summary
m (updated to reflect summary title, and text of motion)
 
(549 intermediate revisions by more than 100 users not shown)
Line 1: Line 1:
{{meetings}}
This is a page for hosting consensus items currently under debate, with their formal wording.
This is a page for hosting consensus items currently under debate, with their formal wording.


The [[Consensus_Items_History|Consensus Items History]] is the public record of consensus items that have been decided on in the past. Please move the records from the "Current" page to the "History" page once they've been approved/blocked.
You might be looking for
* the [[Draft Consensus Items]] page, instead? If your consensus item still drafty, in need of much revision, and not something that you think people already can more or less agree with.
* [[Consensus_Items_History|Consensus Items History]] is the public record of consensus items that have been decided on in the past. Please move the records from the "Current" page to the "History" page once they've been approved/blocked.
 
{| class="wikitable sortable" border="1"


{| border="1"
|-
! Date First Discussed
| Date First Discussed [[XX Month, Year]]
! Proposed By
| Proposed By [[User:User|User]]
! Wording
| Informal Summary Title
! Author of this Record
| Body of Motion
| Author of this Record [[User:User|User]]
|-
|-


|5/15/2012
|[[User:wsargent|Will]]
|That we extend the cleaning contract with Skyline Building Care for another six months.  They come by at the end of each month, it costs $145 each month.
|[[User:wsargent|Will]]
|-
|-
|3/12/2012
| September 5th, 2023
|[[User:miloh|Miloh]]
| proposed by [[User:Mwillson|Mark]]
|Request for up to $300.00 of Noisebridge funds to improve the electronics area infrastructure. Up to $300.00 would be allocated for the cost of material  needed to build a 4th electronics bench, an equipment hutch for the bench, and a storage cabinet for the electronics tools at Noisebridge. Any direct donations to support this project would reduce the amount used from Noisebridge funds by an equal amount.
| 2 member block -- for only freeform motions -- temporary 3 month effect, renew
<br>
| Renewing May 23rd Consensus Item
Estimated expense breakdown:
REVIEWING as of Feb 27th, 2024
$120 qty3 plywood sheets
Updating blocking requirement for big C consensus items from 1 to 2 people. Currently in order to block a big C consensus Item, we need only 1 member to block. Would like to update this number to 2 members. Perhaps the 1 member to block made sense when the community was tiny. It doesn't make sense anymore in our much larger community. If you cant convince anyone else to block with you, then maybe you just have bad ideas. The community should not have to make changes only folks with bad ideas think are good.
$30 qty10 8' 2x4's
 
$30 qty3  8' 1x1 moulding wood
This change would be provisional for 3 months [from May 23, 2023]. Also would only apply for member proposed consensus items, non-member proposed consensus items would still be block able by a single member. Also only 1 member would be required to block new membership. Also if any one member would like to block, but cannot because they are alone, they can request a 1 week hold to defer decision for an additional 3rd week.  
$80 5 sets of linear drawer slides
|Author of this record: [[User:Mwillson|Mark]]
$40 dowels, pins, isc. fasteners
|-
TOTAL
 
$300.00
|-
<br>
| March 12th, 2024
''supporting arguments:''<br>
| proposed by [[User:LX|LX]]
The electronics area is a high traffic area of noisebridge that needs another soldering & lab tool bench, and a better organized storage cabinet for electronics tools. Currently lab tools are stacked on top of each other on the existing lab hutches, and electronics tools are taking up hacker alley shelf space in free floating bins that often get misplaced.
| Consensus to 86 [[User:Gssp|Benjamin]].
<br>
|
Previous funding for many improvements to the electronics area have come from direct donation, including 6 sets of member and hacker alley shelves, the 3 existing electronics benches, many user storage bins, and other small items like castor wheels, fasteners, and shop tools for building. Even the uhaul rental for obtaining the hackitorium lab tables was an out of pocket expense. Help Noisebridge grow up as an organization by coming together to form consenso on this small funding request.
| Author of this Record: [[User:Mcint|Loren]]
|[[User:miloh|Miloh]]
|-
 
 
|-
| March 12th, 2024
| proposed by [[User:LX|LX]]
| Consensus to 86 Fromsa.
|
| Author of this Record: [[User:Mcint|Loren]]
|-
 
 
!
!
!
!
!
 
 
<!-- open consensus item with meeting discussion for over two weeks, no blocks, rolling back to draft for further illumination
|-
| February 16th, MMXXI
| Ⅹ
| Be excellent to each other.
| Fiscal Sponsorship for noisebridge.space project & Party == ON
| ɲ
| Author of this Record [[User:User|User]]
-->
 
|}
|}

Latest revision as of 20:01, 19 March 2024

Noisebridge | About | Visit | 272 | Manual | Contact | Guilds | Resources | Events | Projects | 5MoF | Meetings | Donate | (Edit)
Meetings | Process Meeting Template | Discussion Meeting Template | Archive | Metaguild Archive | Current Consensus Items | Consensus History | Announcements | Facilitation | Note-taking | (Edit)

This is a page for hosting consensus items currently under debate, with their formal wording.

You might be looking for

  • the Draft Consensus Items page, instead? If your consensus item still drafty, in need of much revision, and not something that you think people already can more or less agree with.
  • Consensus Items History is the public record of consensus items that have been decided on in the past. Please move the records from the "Current" page to the "History" page once they've been approved/blocked.
Date First Discussed XX Month, Year Proposed By User Informal Summary Title Body of Motion Author of this Record User
September 5th, 2023 proposed by Mark 2 member block -- for only freeform motions -- temporary 3 month effect, renew Renewing May 23rd Consensus Item

REVIEWING as of Feb 27th, 2024 Updating blocking requirement for big C consensus items from 1 to 2 people. Currently in order to block a big C consensus Item, we need only 1 member to block. Would like to update this number to 2 members. Perhaps the 1 member to block made sense when the community was tiny. It doesn't make sense anymore in our much larger community. If you cant convince anyone else to block with you, then maybe you just have bad ideas. The community should not have to make changes only folks with bad ideas think are good.

This change would be provisional for 3 months [from May 23, 2023]. Also would only apply for member proposed consensus items, non-member proposed consensus items would still be block able by a single member. Also only 1 member would be required to block new membership. Also if any one member would like to block, but cannot because they are alone, they can request a 1 week hold to defer decision for an additional 3rd week.

Author of this record: Mark
March 12th, 2024 proposed by LX Consensus to 86 Benjamin. Author of this Record: Loren
March 12th, 2024 proposed by LX Consensus to 86 Fromsa. Author of this Record: Loren